DSLCore

Shutdown follows its work (S1)

Two fixed plant orders go into a shutdown. Readiness follows a short part, the scope is frozen, a permit is confirmed, the work starts and the campaign completes.

Recorded simulation replay — generated from an actual DSLCore network run (CORR-S1-124755). Pacing is normalised for viewing; the Technical view shows the recorded timings. Nothing on this page is live.

OrchestratorMobile plant workFixed plant workHaul road workShutdownsStockPurchasingFinanceOrchestratorMobile plant workFixed plant workHaul road workShutdownsStockPurchasing

Step by step

Key moment The scope freezing, the milestones being reached, and the work starting. The other steps are the background every story shares.

    This step in detail

    Checked against the reference flow

    S1 — A shutdown follows its work - orders are put in scope and assigned, readiness and progress arrive, the campaign completes. The network's specification declares the messages this flow involves. Every one of them appears in this recording. It also contains messages outside the reference flow: inventory.item_reserved, inventory.item_unavailable, inventory.receipt_accepted, purchasing.delivery_commitment_changed, purchasing.requirement_created, work.assign_campaign, work.material_requirement_changed, work.material_requirement_created, work.work_verified.

    1. ✓ campaign.readiness_changed
    2. ✓ work.readiness_changed
    3. ✓ campaign.scope_frozen
    4. ✓ work.work_started
    5. ✓ campaign.milestone_reached
    6. ✓ work.work_completed
    7. ✓ work.work_closed