Port & Terminal Operations Network · a reference build
Stopped means stopped, everywhere.
When the ship loader at a bulk terminal starts to fail, the people who need to know are in different places: the maintenance crew, the terminal supervisor, the berth planner, the safety officer, the assurance team. In most terminals they find out by phone and by spreadsheet. The same is true of the cargo on the stockpile, the trucks and trains that bring it, and the crew who are allowed to run the machines. Add the dust the stockpiles raise, who may enter which part of the site, and what a tenant is charged, and the same is true of the environmental, security and commercial teams. This network connects the twelve systems they each use, so a warning, a stop, a late train, a failed sample, a dust reading, a revoked access grant or a disputed charge is seen by everyone who has to act, and you can watch it work.
A network is a group of separate applications that cooperate.What is a network?
12 applications and an Orchestrator: Port Infrastructure, Equipment & Maintenance, Terminal Operations, Berth & Marine, Port Safety, Port Assurance, Bulk Cargo & Stockpiles, Gate, Road & Rail, Contractors & Workforce, Environmental Management, Port Security & Access, Tenants & Commercial.
Fictional scenario and synthetic data, on a DSLCore reference build. The terminal, vessels, equipment and people in the story do not exist, no engineering standard or statutory limit is claimed, and the numbers are made up. Every replay is a real recorded run of the network; nothing on these pages is live.
Three stories: a failing machine, a late train, and dust
Each story is its own recording, a separate run of the network starting from the same data, not one continuous run. All three were recorded with all twelve systems connected.
1
Loading is under way
A ship is being loaded at Berth 1 on a plan with a target rate. The terminal starts the programme only because its berth is ready and its safety controls are in place. Berth, safety and assurance are told it has started.
A route reading on the ship loader’s gearbox is in the warning band. Equipment & Maintenance records a defect and tells safety and assurance. Nothing stops yet.
An assessed limit is put on the loader. Terminal Operations recalculates how long the job will now take, and the longer finish time is passed on, so the berth planner can see the next ship’s slot is at risk.
Berth & Marine revises the schedule. A new plan is checked for clashes before it is accepted, and the change is reported to operations and assurance. Assurance assigns obligations to the owners of each part of the response.
The next reading is in the stop band. The loader is stopped, and a safety hold is recorded that every other system can see: the programme is held, and the berth and maintenance know why.
A permit and an isolation make the repair safe, and the repair is finished. Safety releases only its own hold, and only on an authorisation that matches the hold. The person who prepared it cannot be the person who approves it.
Service is restored, and loading resumes on a fresh check
A second person confirms the machine is back in service. Before loading restarts, the berth’s readiness is checked again: an old check does not count. Only then does the programme resume.
Assurance closes the case on independently verified evidence, and every owner is told. The whole trail, from the first warning to the final check, stays on the record.
A second ship is due, and its deliveries are planned
A second ship is due at Berth 1 to load coal. The berth is checked ready, then the gate application confirms a rail slot and a road slot, each within the capacity of its window. An appointment is a plan: it does not touch stock.
The gate records what arrived; only the cargo application posts it
A certified weighbridge ticket is accepted once. The gate application records the delivery, but it never changes stock. The cargo application validates the lot and the quantity itself, and only then posts the ledger.
A sample from one stockpile fails its specification (ash measured at 13.4 % against a limit of 12 %). A hold goes on that pile and no other, and operations, safety and assurance are told.
A credential lapses, and the authorisation goes with it
The critical operator’s credential expires. The workforce application marks the eligibility expired, withdraws the authorisation, holds the assignment and raises a competency exception for assurance to link to the case.
With nobody authorised on the machine, terminal operations report a rate of zero and hold the programme. The berth planner is sent a proposal to review, never a booking.
The train planned for 06:00 arrives at 10:00. The gate application reports the delay and a landside exception, and terminal operations see an impact on the programme. The arrival alone changes no stock.
A second operator is assigned, and is authorised only after a fresh eligibility assessment. This does not release the quality hold, and nothing resumes loading by message.
The hold is released on its own evidence, and the case closes
A fresh passing sample releases only the hold on its own pile. Assurance then closes the single case only after every obligation (the rail receipt, the cargo reconciliation, the berth, the crew and the risk) was independently verified.
A dust station on the stockpile area records a reading above the limit that applies to it. The environmental application checks that the device was calibrated and that the reading is new, and accepts it. The complete 24-hour window now averages over the limit, so an exceedance is suspected, but a suspicion stops nothing.
The automated detection cannot confirm itself, and neither can the analyst who recorded the reading. A supervisor confirms it with evidence. Operations and safety record the finding, and assurance opens one case.
One pile and one loader route are restricted, and no more
The environmental authority restricts the pile that was monitored and caps the loader route. Terminal operations hold the programme that loads from that pile, the cargo application takes the pile out of use, and the berth planner is told which readiness has lapsed. The other berth and the other piles are not named by any message.
A check at the wrong zone was denied. Then, after the contractor’s credential expires, the access officer revokes the grant. The gate application refuses every check-in for that person, and the workforce application withdraws the crew authorisation. A booked gate visit was never an access authorisation, and nothing here opens or closes a gate.
A noncompliance notice and a disputed charge change nothing operational
The tenant is sent a noncompliance notice, and disputes a charge. The commercial application records both. The service impact is recorded without a penalty. The charge stays as it was, a credit is approved only by a second person, and no operation is stopped because a dispute exists.
Independent verification, then the owner releases its own restriction
The person who did the remediation cannot verify it. An independent verifier does, and only then does the authority release the two restrictions. Every application records the release, and nothing else changes: the programme stays held, the pile is not freed, the safety hold and the revoked access stand.
A restored credential and a new request for a grant are approved by a second officer. The old grant stays revoked. The gate application admits the person only after a fresh check, and the workforce application restores nothing by itself.
Assurance closes the one correlated case after the owners complete the actions and an independent verifier checks them, and a reviewer other than the owner approves the closure. Closing resumes nothing: the programmes are still held, and the dispute, the notice and the safety hold stay in their own cases.
Twelve systems, each owning one kind of decision, and an orchestrator that carries messages between them. These are DSLCore reference applications, connected rather than rebuilt.
Carries every message between the twelve, retries when a system is down, and keeps a record of what was sent and received.
Why connect them
A stop is seen by everyone
A safety hold is one record that terminal, berth and maintenance all receive, so nobody loads against a stop because they were not told.
Each system keeps its decision
Safety releases its own hold, the terminal decides when to resume, and the berth planner decides the berth. No system changes another’s record because of a message.
Nobody approves their own work
The person who prepares an authorisation or a plan cannot be the one who approves it, and the person who repairs cannot be the one who verifies.
Plans move without clashes
A revised berth schedule is rechecked for overlaps before it is accepted, and the change is reported with its effect.
Resume needs a fresh check
Loading restarts only when the berth’s readiness has been checked again recently, the controls are current and no hold remains.
Closed on evidence
The case closes only after an independent verification, and the obligations raised along the way are tracked to the owner who must act.
Stock changes in one place
The gate records what arrived and a late train is reported as an impact, but only the cargo application posts to the ledger, so the stock figure cannot be changed by a message from somewhere else.
A hold stays on its own pile
A failed sample holds one stockpile. Safety restrictions and every other pile are untouched, and the hold is released only by a fresh passing sample on that pile.
A lapsed credential stops the work, visibly
When a credential expires the authorisation is withdrawn, the assignment is held and the effect on the programme is reported as zero throughput, not guessed.
A restriction is released only by its owner
An environmental restriction is lifted by the environmental authority on independently verified remediation. It never lifts a safety hold or a security restriction, and none of them lifts it, so a release restores nothing in another application.
Access is a decision, not a gate command
A denied check, a revoked grant and a booked gate visit are three different records. No application in the network sends a command to a gate, barrier or machine.
A dispute stops nothing
A disputed charge, a noncompliance notice and a missed cure date are recorded and tracked in their own cases. None of them suspends service, changes a charge or excludes a tenant.
In the first recorded run, 27 messages were carried between the twelve applications and delivered 211 times. In the second, 58 messages were delivered 304 times. In the third, 47 messages were delivered 246 times. In all three, every delivery succeeded the first time and there was no unresolved exception. Each story is also checked against ten ways it must refuse, such as a message sent twice, a message from a stranger, a release without a matching authorisation, and two people claiming the same stock at once. The third story has its own ten, such as a dust reading delivered twice, a grant at the wrong zone, an expired discharge window, a rate changed after a charge was approved, and a page that a read-only visitor must not be able to open.
How the applications connect
Each application says which messages it sends and which it listens for. The orchestrator carries them from one to the other, and nothing else: it holds no business logic of its own. This is read from the network's own description, so it is the same list the orchestrator routes by.
An arrow means one application sends a message that the other listens for. Every message in fact travels through the orchestrator in the middle; the arrows show who it is for. Select an application to see its connections.
Select an application on the map to see what it sends and what it listens for.
A shell that carries messages from one application to the next. It holds no business logic: it takes each message in, works out which applications asked to hear it, delivers it, and keeps the record.
What is specific to this network
Routes 53 kinds of message between 12 applications.
Waits 10 seconds for an answer. If none comes it tries again after 2 s, 10 s, 30 s, 2 min, 10 min, and after 5 attempts holds the message as a dead letter for someone to look at.
None of these applications knows another's address or how it works inside. Each one only publishes what happened and says what it wants to hear. That is what lets an application be added, replaced or left out without changing the others, and it is why each can also run on its own.
The messages against the applications(53 kinds)
sendslistens forA dash in the last column means the orchestrator has no one to deliver it to.
Message
Port Infrastructure
Equipment & Maintenance
Terminal Operations
Berth & Marine
Port Safety
Port Assurance
Bulk Cargo & Stockpiles
Gate, Road & Rail
Contractors & Workforce
Environmental Management
Port Security & Access
Tenants & Commercial
Heard by
Assurance
Case closed
11
Obligation assigned
11
Cargo
Blend approved
2
Inventory changed
2
Loadout readiness changed
2
Quality hold changed
3
Reconciliation recorded
3
Commercial
Agreement changed
3
Billing approved
1
Charge approved
1
Credit approved
1
Dispute changed
1
Entitlement changed
5
Noncompliance changed
2
Usage validated
1
Environment
Complaint closed
1
Discharge authorised
3
Exceedance changed
3
Incident raised
2
Obligation changed
1
Observation accepted
1
Remediation verified
2
Restriction changed
10
Submission approved
1
Equipment
Capacity changed
7
Defect raised
2
Service restored
3
Work completed
2
Infrastructure
Restriction changed
10
Logistics
Appointment changed
2
Congestion changed
4
Exception raised
2
Gate visit changed
4
Rail arrival changed
2
Rail discharge accepted
2
Weighment accepted
3
Marine
Berth readiness changed
7
Schedule revised
6
Safety
Authorisation changed
7
Restriction changed
11
Security
Access check decided
2
Access grant changed
4
Escort changed
3
Incident raised
2
Inspection verified
1
Level changed
7
Restriction changed
8
Terminal
Programme impact changed
7
Programme state changed
9
Workforce
Assignment changed
3
Authorisation changed
6
Eligibility changed
6
Exception raised
2
Watch it happen
The recording is a real run of the network. Play it, pause it, step through it, and open any message to see who sent it and who received it.
Ship loader failure and controlled restart
A vibration warning on the ship loader derates the loading programme and the berth plan is revised; a stop-class reading holds it; a safety permit, isolation, repair and an independently verified restoration follow; the programme resumes only when every gate passes, and assurance closes the case on verified evidence.
Late rail delivery, quality hold and crew authorisation lapse
A coal train arrives four hours late and the stockpile cannot cover the loading; an accepted delivery is posted to the ledger only by the cargo application, and a failed sample puts a hold on one pile and no other. The critical operator's credential lapses, so the authorisation is withdrawn and the programme's rate falls to zero until a qualified operator is assigned and authorised. Assurance keeps one case open until every effect is independently verified.
A dust reading above the site-configured limit is confirmed and the environmental authority restricts one pile and the loader route; the contractor's access grant is revoked after the credential expires, and a gate visit is never treated as access. The tenant's service impact is recorded without a penalty, a noncompliance notice and a disputed charge change nothing operational, and every release is made by its own owner. Assurance closes the correlated case only on independently verified evidence.
It is a working reference build showing how existing DSLCore applications can be connected so a failing machine is held, repaired, released and independently verified before loading resumes, and how a late train, a failed sample, a lapsed credential, a dust exceedance, a revoked access grant and a disputed charge are each answered by the application that owns them. It is not a real terminal, it claims no engineering standard or statutory limit, and the numbers come from synthetic data on a single machine.