Recorded simulation · H1
Defect and wet-weather closure (H1)
Step by step
Key moment The defect, the segment being closed for wet weather, and its reopening. The other steps are the background every story shares.
This step in detail
Scenario completed
A serious defect became a work order, and the road was closed and reopened
The defect created its work order immediately, and the closure and reopening of the segment were recorded as they happened.
- 1Applications involved
- 4Messages
- 0Unresolved exceptions
Checked against the reference flow
H1 — A serious defect is reported - a work order is made for it at once; the segment is closed for wet weather and reopened. The network's specification declares the messages this flow involves. Every one of them appears in this recording.
- ✓ work.defect_recorded
- ✓ work.work_order_created
- ✓ work.subject_closed
- ✓ work.subject_reopened