Recorded simulation · A2
Haul road material in stock (A2)
Step by step
Key moment The material set aside from stock, the cost posted to the books, and the order closed. The other steps are the background every story shares.
This step in detail
Scenario completed
Haul road material came from stock and the job was costed and closed
The need was met from stock, the cost reached the books, and the road work was closed on a quantity check, without any application reaching into another.
- 3Applications involved
- 11Messages
- 0Unresolved exceptions
Checked against the reference flow
A2 — Haul road material is in stock - reserved at once, issued and its cost posted, the work completed and closed. The network's specification declares the messages this flow involves. Every one of them appears in this recording. It also contains messages outside the reference flow: work.material_requirement_changed, work.readiness_changed, work.work_verified.
- ✓ work.work_order_created
- ✓ work.material_requirement_created
- ✓ inventory.item_reserved
- ✓ inventory.item_issued
- ✓ finance.document_posted
- ✓ work.work_completed
- ✓ work.work_closed