Well Integrity Management
Manages well barrier envelopes, annulus pressures, integrity tests, anomalies and operating limits so each well's integrity status is current and evidenced.
- Well integrity
- Well barriers
- Annulus pressure monitoring
- Well integrity testing
- Operating limits
The operational need
An operator has to show, well by well, that each barrier meets its standard and is performing, and to know exactly what has been agreed when one of them degrades. Well integrity engineers carry that responsibility across the full life of a well, from production through suspension and abandonment, with the testing, monitoring and exception records needed to back each status.
How the work flows
Integrity standard → Barrier envelope → Test or monitoring → Limit excursion → Anomaly assessment → Impairment → Risk acceptance → Corrective action
The well operations management plan sets integrity standards, which break down into control measures, performance standards and measurable acceptance criteria. Each barrier envelope records the minimum number of independent barriers required. When a measurement breaches an operating limit, the excursion is recorded and raised as an anomaly; its assessment decides whether the condition is tolerable or becomes an impairment carrying a temporary control measure, an operating restriction and a time-limited risk acceptance.
What it records
- Wells, wellbores, components and annuli, with status and schematic history, so every reading and test is tied to a specific part of the well.
- Barrier envelopes, barriers and barrier elements, with diagrams and status assessments, showing which barriers are healthy and which are impaired.
- Barrier test plans, tests and per-criterion results, giving evidence against each acceptance criterion.
- Monitoring plans, points, operating limits and integrity measurements, including annulus pressure readings.
- Integrity anomalies, assessments and impairments, holding the full exception history for a well.
- Temporary control measures, operating restrictions and risk acceptances, so the conditions a well is operating under are explicit and dated.
- Interventions, suspension plans and abandonment plans with barrier verification, covering the later stages of a well’s life.
- Incidents, regulatory reports, annual well summaries and corrective actions, keeping reporting and follow-up in one place.
Who would use it
Well integrity engineers, production and operations teams working within operating limits, and the people who hold integrity authority for risk acceptance and regulatory reporting.
Adapting it to your organisation
This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.
Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.