Management of Change

Takes changes to plant, process and procedures through risk assessment, technical review, approval, implementation and close-out, with controls recorded.

Management of Change interface (enlarged)

The operational need

Changes to plant, process, procedures and organisation can introduce hazards that nobody has assessed, or leave drawings, procedures and training out of step with what is actually installed. Facility engineers, technical authorities and operations teams need each change evaluated, approved and followed through until its effectiveness has been confirmed, not just until the work is done.

How the work flows

Change request → Scope and like-for-like test → Screening and classification → Technical basis and risk assessment → Approval → Implementation and PSSR → Effectiveness review → Closure

A replacement-in-kind assessment records whether a change is truly like-for-like or needs a full MoC. Screening across impact domains, followed by classification by type, complexity, urgency and initial risk, shapes how much review the change receives. Approval requirements are routed to roles and satisfied by approval records, and a pre-startup safety review with its checks and commissioning tests records readiness before startup. Temporary changes carry extension requests, and departures from plan are logged as deviations.

What it records

  • Change requests with their scope and affected assets, so the boundary of each change is clear.
  • Replacement-in-kind assessments, documenting why a change does or does not need full assessment.
  • Impact screenings, classifications, technical bases and specialist reviews that make up the engineering case.
  • Risk assessments, change hazards and regulatory impacts, showing what must be controlled or permitted.
  • Approval requirements and approval records, giving a traceable approval route for each change.
  • Document, procedure and training impacts with training completions, so updates and retraining are tracked to completion.
  • Implementation plans and steps, pre-startup safety reviews, PSSR checks and commissioning tests.
  • Temporary changes, extension requests, deviations, effectiveness reviews and closure checklists that govern how a change ends.

Who would use it

Change originators and owners, process and specialist engineers, technical authorities who approve changes, and operations and training staff who carry out the resulting updates.

Adapting it to your organisation

This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.