Control of Work & Isolation Assurance
Manages permits to work, isolations, energy sources, competency, worksite authorisation, SIMOPS conflicts and reinstatement so work is verified first.
- Control of work
- Permit to work
- Isolation management
- Worksite authorisation
- Simultaneous operations
The operational need
Work on hazardous plant is only safe when the permit, the isolation of every energy source and the people doing the job all line up before anyone breaks containment or opens a panel. Permit issuers, isolation authorities and area authorities carry that responsibility, often while other activities run nearby and the job changes partway through.
How the work flows
Work request → Work package and task risk assessment → Permit → Isolation and verification → Start-work check → Work → Test de-isolation → Reinstatement
An isolation is designed as a reusable scheme over isolation points, each tied to an energy source, then applied with executed steps, verification such as test-for-dead, locks and tags, and a group-isolation board where several workers share one isolation. Permits depend on supporting certificates and gas tests, and a start-work check confirms the controls before work begins. SIMOPS activities are assessed for conflicts, and a scope change or work-stop event is recorded as a trigger for reassessment.
What it records
- Work requests, work packages and task risk assessments with their hazards and controls, defining what is being done and why it is safe.
- Permits with dependencies, controls, assigned workers and shift handovers, so authority over the job is clear at every change of crew.
- Authorisations held by people, showing who is competent to issue, perform, isolate or act as area authority.
- Energy sources, isolation points and isolation schemes, giving a reusable isolation design for each item of equipment.
- Applied isolations, isolation steps, verifications, locks, tags and lock applications, as proof that the plant was made safe.
- Supporting certificates, certificate checks, gas test requirements and gas tests that back the permit.
- SIMOPS activities and conflicts, scope changes and work-stop events, capturing what interrupted or altered the job.
- Test de-isolations, reinstatement plans, barrier impacts, findings and actions that close the work out.
Who would use it
Permit issuers and performing authorities, isolation and area authorities, maintenance crews and contractors, and the operations supervisors who de-conflict simultaneous work.
Adapting it to your organisation
This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.
Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.