Recorded simulation · F2
Ship loader failure and controlled restart
Step by step
Key moment The warning, the stop, the safety hold, the independent restoration, the resumed loading and the verified closure. The other steps are the background every story shares.
This step in detail
Scenario completed
A stopped ship loader was repaired, authorised and independently verified before loading resumed
Each application acted only on what it owned: maintenance held and restored the machine, safety released its own hold on a scoped authorisation, the berth plan moved without an overlap, and the terminal resumed on a fresh readiness check - while assurance closed the case only after independent verification.
- 12Applications involved
- 27Messages
- 1Correlation chains
- 0Unresolved exceptions
Checked against the reference flow
F2 — A stop-class reading, a safety hold and the controlled restart - the hold is released only on a matching safety authorisation, service is restored, operations resume and assurance closes the case. The network's specification declares the messages this flow involves. Every one of them appears in this recording. It also contains messages outside the reference flow: assurance.obligation_assigned, equipment.defect_raised, marine.berth_readiness_changed, marine.schedule_revised, terminal.programme_impact_changed.
- ✓ equipment.capacity_changed
- ✓ terminal.programme_state_changed
- ✓ safety.restriction_changed
- ✓ equipment.work_completed
- ✓ safety.authorisation_changed
- ✓ safety.restriction_changed
- ✓ equipment.service_restored
- ✓ terminal.programme_state_changed
- ✓ assurance.case_closed