Environmental Monitoring & Restrictions

Holds a terminal's environmental monitoring readings, effective limits, confirmed exceedances, scoped restrictions and independently verified remediation.

Environmental Monitoring & Restrictions interface (enlarged)

What it is

A terminal has to show that its dust, noise and water discharge stay inside the limits that apply to it, and has to act when they do not. This application holds the monitoring locations and devices, the parameters measured, the limit profiles with their averaging windows and effective dates, the readings, the exceedances, the restrictions placed on a defined part of the site, the remediation that follows, incidents, obligations, submissions and complaints.

A reading counts only when its quality is good and its device was calibrated. A limit is a record, not a number in the code. An exceedance is judged over a complete window: a gap in the data is a data gap, never a zero. A detection is only suspected until a supervisor, who is not the detector, confirms it. A restriction affects only its own scope, and is released by the environmental authority on independently verified remediation, never by a later reading alone.

Within the Port & Terminal Operations Network it tells the rest of the terminal which pile and which route are restricted, and why. The programme, the stockpile and the berth each decide for themselves what to do with that. It never releases a safety, security or infrastructure restriction, and a release of its own restriction restores nothing in another application.

In the public demonstration, the readings, limits, exceedances and restrictions are synthetic, and the limit shown is illustrative.

In the Port & Terminal Operations Network

Here it is known as Environmental Management. This is what it sends to the other applications and what it listens for, read from the network's description. Select a message to see it happen in a recorded simulation.

Sends (9)
  • environmentComplaint closedto Port Assurance
  • environmentDischarge authorisedto Terminal Operations, Port Safety, Port Assurance
  • environmentExceedance changedto Terminal Operations, Port Safety, Port Assurance
  • environmentIncident raisedto Port Safety, Port Assurance
  • environmentObligation changedto Port Assurance
  • environmentObservation acceptedto Port Assurance
  • environmentRemediation verifiedto Port Safety, Port Assurance
  • environmentRestriction changedto Port Infrastructure, Equipment & Maintenance, Terminal Operations, Berth & Marine, Port Safety, Port Assurance, Bulk Cargo & Stockpiles, Gate, Road & Rail, Port Security & Access, Tenants & Commercial
  • environmentSubmission approvedto Port Assurance
Listens for (13)

See it on the map of the networkAbout the network

Adapting it to your organisation

This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.

Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.