Isolation & Permit-to-Work
Manages energy sources, isolation points, locks and tags, zero-energy verification, permits, worker sign-on, handover and restoration for permitted work.
- Permit to work
- Isolation management
- Lockout tagout
- Zero energy verification
- Hazardous energy control
The operational need
Before anyone works on a conveyor, crusher or excavator, every source of hazardous energy on it has to be found, isolated, locked and proven dead, and kept that way until the last worker is clear. Isolation officers, permit issuers and area owners carry that responsibility, and a missed energy source is the failure the records are built to prevent.
How the work flows
Work request → Isolation request → Energy sources and isolation points → Locks and tags → Zero-energy verification → Permit and worker sign-on → Handover → Restoration
The isolation, not the permit or the work order, is the controlling record, and work is not to start until it is active with every required step verified. A failed zero-energy test is kept as its own record and marks the step as an exception rather than being overwritten. Only its owner may remove a personal lock; any other removal is recorded as forced and needs a linked approval. A test release names the exact points being released and is not complete until they are reapplied and re-verified, and restoration waits until permits are closed, workers signed off and every personal lock removed.
What it records
- Assets and energy sources: the hazard inventory, including stored energy and whether it can re-accumulate.
- Isolation points and isolation templates: how each point is isolated and proven, in an approved order.
- Isolation requests and steps: each point applied, dissipated, verified and later restored, each stage signed and timed.
- Isolation verifications: the instrument, its calibration due date, the reading observed and the outcome.
- Locks, tags, lock applications and group isolation boards: one personal lock per worker, tied to the board and the scope they acknowledged.
- Permits, permit controls, permit workers, work execution and handovers: who is signed on and how the job changes hands.
- Test releases and restoration checklists: the confirmations needed to re-energise plant temporarily or return it to service.
- Isolation events, audits, findings, corrective actions and authorisations: breaches and failed tests followed through, and whose competencies are current or expiring.
Who would use it
Isolation officers, permit issuers, area owners, maintenance crews and contractors on group boards, and safety auditors.
Adapting it to your organisation
This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.
Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.
More Mining applications
- Blast Planning & Explosives Management
- Contractor & Site-Interface Management
- Contractor & Site-Interface Management — Arabic (RTL)
- Critical Control & Principal Hazard Management
- Dust Exposure & Occupational Hygiene
- Emergency Preparedness & Exercises
- Geotechnical & Ground-Control Management
- Mine & Condition-Monitoring Laboratory
- Mine Production & Sales Reporting
- Mineral Exploration Management
- Progressive Rehabilitation & Mine Closure
- Tailings Storage Facility Management