DSLCore
MiningWorking reference application

Critical Control & Principal Hazard Management

Manages principal hazards, material unwanted events, critical controls, performance standards, verification and corrective action, with control health by owner.

Critical Control & Principal Hazard Management interface (enlarged)

The operational need

Mines manage each principal hazard through a small set of critical controls, and the hard question is whether those controls are working today. Safety and risk teams need the hazard, its material unwanted events, each control’s performance standard, the verification that tests it and the corrective action that fixes it held as one connected record, so a failed control stays in view until its restoration is proven.

How the work flows

Principal hazard → Material unwanted event → Critical control → Performance standard → Verification event → Control deficiency → Corrective action → Restoration verification

Every critical control belongs to exactly one material unwanted event and carries a control objective, failure criteria, an owner and a verification frequency. A failed verification raises a control deficiency with its severity, any operational restriction and a temporary control; level 4 and level 5 deficiencies escalate immediately. A completed work order does not restore the control: an independent restoration verification is needed before the control returns to effective and the operation is released.

What it records

  • Publications, requirements and site obligations: legislation, standards and guides broken into requirements, each interpreted for the site with a responsible position.
  • Principal hazards, hazard scenarios and material unwanted events: the bowtie structure each control hangs from.
  • Critical controls and performance standards: what each control must achieve and who owns it.
  • Verification templates, schedules and events: field observations, function tests, document reviews and telemetry checks.
  • Control deficiencies and restoration verifications: the failed state and the independent evidence that ends it.
  • Adverse events and investigations: actual and potential severity recorded separately, linked to the controls that were expected to operate and those that failed.
  • Audits, management of change and principal hazard management plans: the governance that ties hazards, controls and requirements together.
  • KPIs and notifications: leading, lagging and control-quality measures that keep failures visible.

Who would use it

Control owners, the people who carry out verifications, safety and risk advisers, investigators, and site managers reviewing control health.

Adapting it to your organisation

This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.

Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.