DSLCore
Government AssuranceWorking reference application

Information Systems Controls & Remediation Manager

Assesses the design and operating effectiveness of information systems controls, logs control issues and tracks remediation, testing and evidence to closure.

Information Systems Controls & Remediation Manager interface (enlarged)

The operational need

Auditors assess general IT controls — access, change and operations — over an organisation’s key systems, particularly its financial systems. When a control proves ineffective, the fix is not trusted until an independent retest shows it works, and a repeat or blocking deficiency cannot be closed by assertion. Interim acceptance of residual risk also has to be kept distinct from closure.

How the work flows

Information system → Control → Control assessment → Deficiency → Remediation plan → Retest → Closure approval

A deficiency’s status can only follow allowed transitions: remediation starts on an approved current plan, it becomes ready for retest only when every action on that plan is complete with who and when recorded, and it is resolved only when the latest retest passed. A closure approval cannot be saved as approved unless the latest retest passed, no current-plan action is blocked and the closure request declares completion. Reaching accepted status instead requires an approved risk acceptance.

What it records

  • Information systems — each system in scope, with criticality, lifecycle stage and whether it is a financial system.
  • Control domains, objectives and controls — what a set of controls must achieve and the specific control on each system.
  • Assessment cycles and control assessments — design, operating and overall effectiveness for each control tested in a cycle.
  • Evidence requirements and submissions — what a control or assessment needs and what was provided, with checksum.
  • Control deficiencies — severity, whether it is a repeat finding and whether it blocks closure.
  • Remediation plans and actions — versioned plans with a current flag and the actions committed under them.
  • Retests — independent retests with a passed, partial or failed outcome.
  • Risk acceptances, assurance decisions and closure approvals — interim acceptance, authorised decisions and the closure outcome, alongside each deficiency’s status history.

Who would use it

IT auditors, system and control owners responsible for remediation, independent testers, and the managers who approve risk acceptance and closure.

In the Australian Government AI Assurance Network

Here it is known as Controls. This is what it sends to the other applications and what it listens for, read from the network's description. Select a message to see it happen in a recorded simulation.

Sends (6)
  • controlsAssessment failedto AI Register, Governance, Management View
  • controlsAssessment passedto AI Register, Management View
  • controlsDeficiency closedto Management View
  • controlsDeficiency identifiedto Governance, Management View
  • controlsRemediation completion claimedto Independent Audit
  • controlsRisk acceptedNo one in this network listens for it
Listens for (4)

See it on the map of the networkAbout the network

Adapting it to your organisation

This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.

Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.

More Government Assurance applications

All Government Assurance applications and networks