ERP Replacement Assurance Manager

Governs ERP replacement programmes through readiness areas, design and controls, testing and go-live assurance decisions, each backed by recorded evidence.

ERP Replacement Assurance Manager interface (enlarged)

The operational need

Replacing a core finance or HR and payroll system carries high risk: migrated data must reconcile to control totals, payroll must be proven by a parallel run, interfaces to banks and downstream systems must work, and one defect in the wrong place can block go-live. Independent assurance over the programme needs evidence for each of these points, not a status report saying the plan is on track.

How the work flows

ERP project → Requirement → Solution design → Migration batch → Reconciliation → Test case → Defect → Go-live decision

Approval to go live depends on four conditions: every mandatory readiness area is ready, no go-live-blocking defect is open, every mandatory reconciliation has passed, and each mandatory evidence requirement has an accepted submission. Where these are not all met, the decision is recorded as conditional or deferred rather than approved. Closure of the programme is meant to follow only once the go-live conditions are evidenced as met.

What it records

  • ERP projects, legacy systems and business processes — the programme, the systems being replaced and the processes in scope.
  • Requirements and solution designs — scoped requirements by type and the designs that meet them.
  • Data objects, migration rules and migration batches — what is migrated, how it is transformed, and each load’s control totals.
  • Reconciliations — source-versus-target checks against a tolerance.
  • Interfaces — integrations to and from the new system and their status.
  • Test cycles, test cases and defects — expected and actual results, and defects flagged as go-live-blocking, with remediation actions.
  • Evidence requirements and submissions — the proof needed for requirements and defect fixes, and what was provided.
  • Readiness areas, go-live decisions and closure approvals — readiness by area, the authorised go-live outcome and the closure outcome.

Who would use it

Programme assurance and audit teams, ERP programme managers, test and data migration leads, and the board that makes the go-live decision.

Adapting it to your organisation

This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.

Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.

More Government Assurance applications

All Government Assurance applications and networks