Grid Connection Assurance

Manages grid connection requirements, submissions, technical reviews, risks and exceptions, so each requirement is evidenced and reviewed before it closes.

Grid Connection Assurance interface (enlarged)

The operational need

Connecting a generator to the network depends on satisfying a long list of requirements — performance standards, models, SCADA, metering, protection and registration — each with its own owner, reviewer and due date. Requirements depend on one another, submissions are revised and resubmitted, and one rework request can hold up everything behind it. Connection teams need a single view of where each requirement stands, what is blocking it and what risk it carries.

How the work flows

Connection project → Requirement → Dependency → Submission → Technical review → Evidence → Risk or exception

Each requirement is met through submissions that are versioned, with a later submission superseding an earlier one. A technical review returns one of four outcomes: accepted, accepted with conditions, rework required or rejected. Dependencies record which requirements block, require or inform others, so a requirement still under review can be seen holding up the next one. A requirement is accepted on the strength of an accepted submission and technical review, and conditions or rework from a review are carried forward as risks and exceptions.

What it records

  • Connection projects — region, connection point, technology, capacity and target dates for each connection.
  • Connection requirements — grouped by category, each with an owner, reviewer, due date and materiality.
  • Dependencies — the ordering between requirements, so blocked work is visible.
  • Submissions — each version lodged against a requirement and what it superseded.
  • Technical reviews — the reviewer’s outcome and any conditions on acceptance.
  • Evidence items — material such as acceptance letters that backs a requirement or review.
  • Connection risks — likelihood, consequence and rating for threats to the connection.
  • Connection exceptions — issues, such as required rework, that block progress.

Who would use it

Connection managers and engineers on generation projects, and the technical reviewers who assess submissions against each requirement.

Adapting it to your organisation

This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.

Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.