Data CentresWorking reference application

Data Centre Infrastructure Assurance

Connects data centre critical controls, asset dependencies, assurance exceptions and operational changes so critical-infrastructure decisions have full context.

Data Centre Infrastructure Assurance interface (enlarged)

The operational need

A critical-facilities team at a data centre has to know, at any moment, whether its critical controls are actually effective, where the open exceptions are and how serious they are, and whether a planned change will break redundancy. Those answers usually sit in separate places, so a generator service can be approved while the battery string that backs the same power path is already degraded.

How the work flows

Critical event → Critical control → Verification requirement → Verification activity → Assurance exception → Change request → Operational conflict → Corrective action

A control with no current verification reads as unverified, which is treated as a gap rather than a pass. An exception can carry an interim control, a condition that must hold in the field until the exception is closed, such as keeping a standby generator available. When a change would compromise redundancy, run alongside another outage or cut across an open exception, the clash is recorded as an operational conflict with a severity and a blocking flag that should stop approval of the change.

What it records

  • Sites and locations: the campus, buildings, data halls and plant rooms where infrastructure sits.
  • Assets and asset dependencies: which equipment feeds, backs up, cools or stands by for which, along each redundancy path.
  • Critical events and critical controls: the losses being protected against and the preventive, mitigating and recovery controls for each.
  • Control assets: which equipment delivers each control, as primary, backup or monitoring.
  • Verification requirements and activities: how each control is proven, how often, and the latest measured result.
  • Assurance exceptions and corrective actions: degraded, failed or unverified controls, their severity, and the action that closes them.
  • Change requests and change assets: planned, corrective and emergency work, the equipment affected and its expected redundancy impact.
  • Evidence and approvals: test results, photos and certificates, and the decisions on changes and risk acceptances.

Who would use it

Critical-facilities and data-centre operations managers, engineers reviewing change impact, and staff carrying out control verifications and corrective actions.

Adapting it to your organisation

This is a working demonstration and a developed starting point, not a universal procedure. An implementation is tailored and validated against your organisation's terminology, roles and responsibilities, workflow states, approval rules, reporting, evidence requirements, integrations and existing data.

Where specialist systems already perform engineering, telemetry, financial or analytical functions, they stay in place. DSLCore holds the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.